Paper industry:electro installation of the coater machine

For the paper producer Mondi Štětí ENGIE executed delivery of electro installation including Control & Instrumentation. Preparation work was carried out during normal machine operation. The connecting peripherals on the machine were fixed during time-bounded shutdown. The installation was carried out under ongoing shift work.

Installation was executed in a very high quality standard and with respect to all specific requirements for deliveries in the paper industry.

Technology: 

  • Supply and installation of cable traces and cables
  • Installation of field instrumentation
  • Installation of cabinets in substations
  • Participation on commissioning and startup
  • PCS 7, Substations MCC

Customer: Valmet

Realization: 2014-2015

Other references in the paper industry:

  • 2012 new TM7 Metsä Tissue Krapkowice, Poland (for VOITH Paper)
  • 2012/13 new TM5 SCA Hygiene Products Mainz-Kostheim, Germany (for VOITH Paper)
  • 2013 new TM8 Metsä Tissue Krapkowice, Poland (for VOITH Paper)
  • 2013/14 rebuild of PM7 Mondi Štětí (for Siemens-Mondi)
  • 2014 new TM7 Fripa Miltenberg, Germany (for VOITH Paper)
  • 2014 PM6 coating Mondi Štětí (for Valmet)
  • 2014 end part rebuild of PM10 Kvarnsveden, Sweden (for Voith Paper)
  • 2014 TM5 increasing of power of Hood ventilation, SCA Hygiene Products Mainz-Kostheim, Germany (for VOITH Paper)
  • 2015 PM2 former and press part rebuild SK Wrexen (for Kresta Paper)